波多野结衣AV高清在线AOBO|国产一级特黄高清大片|精品无码人妻一区二区三区18|久久精品一区二区三区色欲网|

Welcome to Western Power
Solution Expert | Stock code:002630
News | Industry information| Party building information| Announcements and Notices
No.1 Unit of Xinjiang Qiya Aluminium Electricity Project has Completed Successfully in the Reliability Test Running with Full Load for 168 Hours
2014-04-28

  At 9:40 p.m., December 17, 2013, under the witness of each construction participants, the No.1 unit of subcritical boiler (4x360MW) which is designed and manufactured by CWPC has completed successfully in the reliability test running with full load for 168 hours
  During trial run, all the technical parameters of No.1 unit are matched with design requirement. The synchronization of TG and boiler is in good condition. No incorrect tripping phenomena of thermal control protection occurred .The operation of this unit has turned out stable, each technical index turned out good, which has fully demonstrated the good operating capability of this unit.
  The subcritical boiler (4×360M) is designed by CWPC aiming at the fuel characteristics of “ZhunDong Coal” in Xinjiang. This successful reliability test running has fully demonstrated the comprehensive strength of CWPC and built a strong foundation for the manufacturing and installation of the following units.

? 吴忠市| 积石山| 巍山| 寿阳县| 靖州| 阿巴嘎旗| 福建省| 武夷山市| 崇州市| 弋阳县| 北川| 旺苍县| 拜泉县| 和静县| 长子县| 邵东县| 鲜城| 佳木斯市| 嘉义县| 乌拉特中旗| 南岸区| 石棉县| 雷州市| 廊坊市| 莲花县| 大丰市| 开封县| 雷山县| 阳山县| 偃师市| 库尔勒市| 深水埗区| 阳江市| 南京市| 乌兰察布市| 黄平县| 赤城县| 沙坪坝区| 赫章县| 璧山县| 绿春县|